Quantcast
Channel: Transnet Freight Rail – What Happened to the Portcullis?
Viewing all articles
Browse latest Browse all 5

Transnet Freight Rail to provide VGM Service for customers

$
0
0

Transnet Freight RailAs from 1 July 2016, Transnet Freight Rail (TFR), as a transporter, must obtain proof of sea export container weights for rail to a Transnet Port Terminals (TPT) port facility. TPT has already engaged with all its shipping line customers and all respective bodies. Customers working on average mass will not be allowed to do so as from 1 July 2016 and must provide verified proof of the mass loaded into a container.

After reviewing the requirements of SOLAS, TFR has come to the conclusion that it is able to offer the service to provide the Verified Gross Mass (VGM) for Method 1 to customers who make use of Transnet rail services for export containers railed from TFR terminals equipped with weighbridges – click here to read TFR’s requirements for VGM.

The following links provide examples of the documentation and declaration which must be made available to TFR either as part of the documentation or as a separate attachment –

Source: Transnet Freight Rail


Filed under: container weighing, Containerization, International Shipping, Transnet Tagged: container, railway service, SOLAS, South Africa, Transnet Freight Rail, verified gross mass, VGM

Viewing all articles
Browse latest Browse all 5

Latest Images

Trending Articles





Latest Images